terms of work
2020-2021
square
40 000 m²
Scope of work
Structural solutions, metal and reinforced concrete structures
description
The warehouse complex building with built-in administrative and household premises was designed in a combined frame with reinforced concrete columns and steel coating. The time-tested solutions of the LENKON company for rafter and sub-truss farms were applied, which ensured the consumption of steel for coating - 15.2 kg/m2.
The implementation of both stages of P and R by LENKON engineers made it possible to build the process of designing, passing expertise and issuing documentation for construction and installation works without delays, unnecessary re-approvals and with minimal deadlines.
Also, all auxiliary buildings (checkpoint, boiler room, canopies) and foundations for shelving were designed for the warehouse complex.
Warehouse complex
Moscow region, Istra city district
ORIENTIR
888 tons of ferrous metal