Before starting the construction of any object, it is very important to find a reliable design organization. Mistakes at any stage of the development of building projects threaten the customer with unnecessary labor and financial costs, sometimes in colossal quantities.
The development of project and working documentation is a multi—stage process involving complexities of various kinds and requiring knowledge of the specifics of many related areas. Therefore, designers must have professionalism and extensive experience for the proper implementation of all assigned tasks for the design of building structures.
The maximum span of the projected building is 78 m²
The maximum grid of columns implemented in the project is 46m x 46m
The record for the consumption of steel for covering the warehouse complex of the company "Technoavia" (2021), II-III degree of fire resistance, is 15 kg/m²
16
Shopping malls and shops
Residential buildings and hotels
Power transmission poles
Cell towers
Stairs
Pedestrian galleries
Overpasses
Half-timbered structures
Industrial platforms
Agricultural buildings and facilities
Industrial buildings
Warehouses and logistics terminals
Hangars
Large-span buildings and structures
Public and medical buildings
Administrative and office buildings
implemented projects
— 745 objects
stages of work
01 – Initial data analysis (picking the location, economic justification etc.)
02 – Working out the terms of reference on the construction project according to all customer’s requirements and recommendations
03 – Draft project development on the chosen object location
04 – Working out the location layout project;
05 – Working out technical terms. After their approval, they will be the core of the project documentation development
06 – Project documentation development (creation, coordination and approval)
07 – Approval of the finished project in the expert institutions