Airport terminal complex of domestic air lines of Vladikavkaz International Airport

terms of work

2021

square

2880 m²

Scope of work

Metal structures

description

LENKON has developed working documentation for metal structures for the Terminal complex of domestic air lines of Vladikavkaz International Airport. The scope of work included:
- coating designs
- exterior and interior half-timbered
- the visor of the main entrance and other secondary structures.
The working documentation of the coating structures was completed in 2 months. During the development, a verification calculation was made taking into account 11 scenarios of progressive collapse and seismic impact (7.9 points).

Based on the results of the calculation of the coating structures, the design solutions were optimized and the metal consumption was reduced by 42 tons compared to the "P" stage.
A feature of this project was the unique architectural form of the coating, bearing metal structures for which were developed using three-dimensional parametric modeling.
Due to the complexity of the design solutions, LENKON accompanied the implementation of the project at all stages: from factory production to installation.

Object type

Airport infrastructure

Address

Republic of North Ossetia - Alania, Beslan city, Pravoberezhny district, Vladikavkaz Airport

Customer

Spectrum-Holding LLC

Total tonnage of ferrous metal products

331 tons of ferrous metal

team ⸺

Abakshin Nikolay Grigoryevich
Borisova Olga Alexandrovna
Marinenko Darya Olegovna
Ladeishchikov Anton Igorevich
Nazarov Vladimir Valerevich
Nafikova Adel Azatovna
Barymov Vitaly Stanislavovich