terms of work
2021
square
2880 m²
Scope of work
Metal structures
description
LENKON has developed working documentation for metal structures for the Terminal complex of domestic air lines of Vladikavkaz International Airport. The scope of work included:
- coating designs
- exterior and interior half-timbered
- the visor of the main entrance and other secondary structures.
The working documentation of the coating structures was completed in 2 months. During the development, a verification calculation was made taking into account 11 scenarios of progressive collapse and seismic impact (7.9 points).
Based on the results of the calculation of the coating structures, the design solutions were optimized and the metal consumption was reduced by 42 tons compared to the "P" stage.
A feature of this project was the unique architectural form of the coating, bearing metal structures for which were developed using three-dimensional parametric modeling.
Due to the complexity of the design solutions, LENKON accompanied the implementation of the project at all stages: from factory production to installation.
Airport infrastructure
Republic of North Ossetia - Alania, Beslan city, Pravoberezhny district, Vladikavkaz Airport
Spectrum-Holding LLC
331 tons of ferrous metal