News

We present you the new website of the LENKON company. 

Within six months we have updated and rethought the corporate identity of the company, the logo, the structure of the site. Now it has become comfortable and modern. 

In the "Projects" section you can study our works - for each of them there is a separate page with a detailed description and photos. In addition, there is an interactive map in the section, which shows the geographical location of some of our projects.

We also have a page with a description of services - you can find it in the site menu. 

We decided to tell you about our team separately - now a large section with beautiful photos of employees and detailed information about them is dedicated to it. You can find out about the professional experience, completed projects and even the hobbies of our employees, and also send us your resume if you want to work with us. 

We will not disclose all other interesting details. We suggest that you explore the site yourself and get to know the company anew. 

Yours LENKON.

The verification calculation of the existing metal structures of the "Ball" was carried out within the framework of the object "Construction of the exposition building "World Ocean" and the pavilion (the 3rd stage of construction of the Main building of the Museum of the World Ocean) at the address: Kaliningrad, nab. The results of the calculation showed that the adopted sections provide the required level of load-bearing capacity, with the exception of stairs steps for which the maximum deformations are exceeded.

Download drawings (PDF)